Quantcast
Channel: PTC Community: Message List
Viewing all articles
Browse latest Browse all 11560

Re: random tool numbering?

$
0
0

just on using temlates and process manager, I have another problem with tooling.

 

I have to program twin turrets, so my saved templates are showing HEAD 1 and HEAD 2 as they have been created, I have even opened the xml file and checked that it is saved this way, and the parameter within the xml file is correct.

 

Now when I bring a template back into the process via the process manager, HEAD 1 imports correctly without issue, but HEAD 2, which was saved as HEAD 2 and is in the file as HEAD 2, is imported into HEAD 1, this results in the tool assigned being dumped into the tool table for HEAD 1.

 

I have to then select no tool, switch the HEAD1 to HEAD 2, then go in and delete the tool if they haven't been assigned, but if a sequence is already using it , regardless of the HEAD selected, I can't remove it, this leads to messed up tool tables.

 

I have repeatly flagged this with PTC , but they don't want to know about it

 

If only they could spend some time to fix little issues like this , it would make the software far more productive to use.


Viewing all articles
Browse latest Browse all 11560

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>